Page 4 - My FlipBook
P. 4
ural Gas Services Cultural Resources
Archaeology
Routing Predictive modeling
Pipeline desktop studies Phase I, II, and III studies
Pipeline constructability surveys Historic architecture surveys and documentation
Civil/Site Layout
Survey Compressor station site layout
GIS services Well pad design
Center line staking Above-ground appurtenances
Limit of disturbance for pipelines SPCC Plans
Construction stake-out Preparedness Prevention and Contingency Plans
As-built surveys Spill Prevention Containment and Control Plans
FERC Certification Our team understands
Environmental report preparation the owner’s perspective,
NEPA document preparation having worked in the
Assistance with blanket certification annual filings industry for many years.
Environmental Permitting and Planning
Permitting strategy discussions
Wetland and stream delineation and mitigation
Erosion and Sedimentation Control Plans and permitting
404/401 permitting
Rare, threatened, and endangered species
consultation and surveys including bat surveys
Phase I, II, and III ESAs and due diligence for acquisitions
Archaeology
Routing Predictive modeling
Pipeline desktop studies Phase I, II, and III studies
Pipeline constructability surveys Historic architecture surveys and documentation
Civil/Site Layout
Survey Compressor station site layout
GIS services Well pad design
Center line staking Above-ground appurtenances
Limit of disturbance for pipelines SPCC Plans
Construction stake-out Preparedness Prevention and Contingency Plans
As-built surveys Spill Prevention Containment and Control Plans
FERC Certification Our team understands
Environmental report preparation the owner’s perspective,
NEPA document preparation having worked in the
Assistance with blanket certification annual filings industry for many years.
Environmental Permitting and Planning
Permitting strategy discussions
Wetland and stream delineation and mitigation
Erosion and Sedimentation Control Plans and permitting
404/401 permitting
Rare, threatened, and endangered species
consultation and surveys including bat surveys
Phase I, II, and III ESAs and due diligence for acquisitions