68 Mile Pipeline Project Environmental Studies Overview
Eastern Kentucky
GAI worked closely with the Federal Energy Regulatory Commission (FERC) to obtain FERC permitting for a 68-mile gas pipeline. From Phase I/II archaeological investigations to detailed rare, threatened, and endangered (RTE) species investigations for the bald eagle, GAI’s comprehensive environmental study efforts met the aggressive schedule and construction started within 15 months.
![68 Mile Pipeline Project Environmental Studies](http://gaiconsultants.com/wp-content/uploads/2015/08/BigSandySlider1.jpg)
![68 Mile Pipeline Project Environmental Studies](http://gaiconsultants.com/wp-content/uploads/2015/08/BigSandySlider5.jpg)
![68 Mile Pipeline Project Environmental Studies](http://gaiconsultants.com/wp-content/uploads/2015/08/BigSandySlider4.jpg)
![68 Mile Pipeline Project Environmental Studies](http://gaiconsultants.com/wp-content/uploads/2015/08/BigSandySlider3.jpg)
![68 Mile Pipeline Project Environmental Studies](http://gaiconsultants.com/wp-content/uploads/2015/08/BigSandySlider2.jpg)