SR 600/US 92 Pedestrian Improvements Design-Build Overview
Volusia County, FL
This high-profile pedestrian safety project changed the character of the Daytona International Speedway corridor (SR 600/US 92) by creating a pedestrian-friendly destination and unique gateway to Daytona Beach and the International Speedway. Work included upgrades to the Williamson Boulevard/SR 600 intersection and five other intersections, new mast arms, audible pedestrian signals, intelligent transportation systems, a closed drainage system throughout the 1.38-mile project limits, and amenity improvements from Williamson to Midway Avenue.
Recipient of the following awards:
- SASHTO 2016 Quality of Life & Community Development – Small Category Award
- FICE 2016 Outstanding Design-Build Project Award
- FTBA 2016 Best in Construction Special Significance Award
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_02.jpg)
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_10.jpg)
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_03.jpg)
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_04.jpg)
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_09.jpg)
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_05.jpg)
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_06.jpg)
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_07.jpg)
![SR 600/US 92 Pedestrian Improvements Design-Build](http://gaiconsultants.com/wp-content/uploads/2016/05/SR600_08.jpg)