I-376 Hopewell Interchange Rehabilitation Overview
Beaver County, PA
GAI’s cost-saving approach to this design-build effort was substituting prestressed concrete spread box beams for the proposed I-beams, eliminating three and two beam lines on the SB and NB structures, respectively. This solution reduced construction costs and minimized future maintenance costs for the owner.