Community Medical Building Foundation Design Overview
St. Marys, PA
In order to meet the healthcare needs of communities in three neighboring counties, a three-story 30,000 sq.ft. medical facility was constructed. GAI was responsible for civil engineering and structural foundation design for the new building that includes a laboratory, diagnostic imaging and X-ray services. The construction cost was $5 million.
![Community Medical Building Foundation Design](http://gaiconsultants.com/wp-content/uploads/2015/08/l090716-community-medical-slider.jpg)
![Community Medical Building Foundation Design](http://gaiconsultants.com/wp-content/uploads/2015/08/l090716-st-marys-medical-bldg3-slider.jpg)
![Community Medical Building Foundation Design](http://gaiconsultants.com/wp-content/uploads/2015/08/l090716-st-marys-medical-bldg3-slider2.jpg)