69kV and 138kV Underground Electric Transmission Line Relocations Overview

Kentucky

GAI performed geological reconnaissance and level and visual surveys prior to developing varied duct bank configurations that would minimize the difficulty of crossing existing utilities and facilities when relocating three underground transmission lines. This cost-effective approach improved electrical ratings for the owner.