Structural Evaluation of the Bridge at a Dam Overview
Northeast United States
GAI performed a structural condition assessment of the north bulkhead and access bridge at a dam in Northeast PA. Along with a site visit, the purpose of this assessment was to identify areas that required repair, quantify deterioration of existing structures, and provide repair recommendations for the remediation of the observed deterioration. GAI prepared a structural condition assessment comprehensive report to aid in the planning of future repairs.