I-295 East Beltway at UNF Drive Design-Build Overview
Jacksonville, FL
A member of the Design-Build team that worked on this major interstate alignment project, GAI provided civil engineering for Segment 6, a four-lane divided section of interstate highway that included a 2,072-foot trestle bridge and a single point urban interchange at the University of North Florida. Under a separate contract, GAI’s solutions for sanitary, water, and reclaimed water utilities put them into service within right-of-way before the existing facilities were removed.
![I-295 East Beltway at UNF Drive Design-Build](http://gaiconsultants.com/wp-content/uploads/2015/07/A030010-00-sr-9a-25-950by450.jpg)
![I-295 East Beltway at UNF Drive Design-Build](http://gaiconsultants.com/wp-content/uploads/2015/07/a030010-00-sr-9a-27-950by450.jpg)
![I-295 East Beltway at UNF Drive Design-Build](http://gaiconsultants.com/wp-content/uploads/2015/07/A030010-00-sr-9a-31-950by450.jpg)
![I-295 East Beltway at UNF Drive Design-Build](http://gaiconsultants.com/wp-content/uploads/2015/07/a030010-00-sr-9a-5-950by450.jpg)