69kV Transmission Line Rebuild in Indiana Overview
Indiana
GAI provided engineering design services for this 5.4-mile transmission line rebuild with distribution underbuild. The design included replacement of wood poles with direct embed steel poles and replacement of three existing switches with 2000A SEECO one-way switches. GAI also designed the distribution line.