69kV Transmission Line Rebuild in Indiana

69kV Transmission Line Rebuild in Indiana Overview

Indiana

GAI provided engineering design services for this 5.4-mile transmission line rebuild with distribution underbuild. The design included replacement of wood poles with direct embed steel poles and replacement of three existing switches with 2000A SEECO one-way switches. GAI also designed the distribution line.

Oops...
Slider with alias D140207.47 69kVTransmissionLine not found.

Learn More.

CONNECT WITH GAI

Related Services

View All

Other GAI Projects

View All