Colorado Wind Project – Civil and Environmental Services

Colorado Wind Project – Civil and Environmental Services Overview

Colorado

GAI performed civil engineering design and permitting services for a wind farm in Colorado. The project is a 75 MW wind generator facility consisting of 30 Gamesa G1142.1 MW wind turbines and six Gamesa G1142.0 MW wind turbines. The project will utilize 36 turbines atop 80-meter-high towers with 114-meter rotors. The project will be interconnected to a service company via a loop-feed tie to an existing 230kV transmission line adjacent to the project substation. GAI’s tasks included conceptual plans, 60 percent design/bid package (grading plan – access roads; grading plan – 36 turbines; grading plan – project facilities; E&S control design of the access roads and turbine; stormwater management design of the access road and turbine; E&S control design of the project facilities; stormwater management design of the project facilities; engineers estimate; site review of the facility layout; review of offsite roadway improvements; and review of all impacted bridges and culverts), Issued for Construction (IFC) design package, SWPPP, and permitting support.

Learn More.

CONNECT WITH GAI

Related Services

View All

Other GAI Projects

View All