Halifax River Subaqueous Water Main Crossing Overview
Daytona Beach, FL
The city of Daytona Beach was limited in transmission capacity to the beach-side customers after a failed 70-year old cast iron line failed at the river crossing. GAI’s team of water transmission experts provided preliminary design, final design, permitting, bid support, and construction administration services a 30-inch Subaqueous water main crossing the Halifax River. The project included approximately 4,500 linear feet of 30-inch pipeline in total.
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver01.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver02.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver03.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver04.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver05.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver06.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver07.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver08.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver10.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver11.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver12.jpg)
![Halifax River Subaqueous Water Main Crossing](http://gaiconsultants.com/wp-content/uploads/2016/03/HalifaxRiver13.jpg)