230kV Transmission Line and Foundation Design

230kV Transmission Line and Foundation Design Overview

North Carolina, Virginia

When it was determined that a new line was needed to continue to provide reliable electric service to certain areas, GAI provided transmission line and foundation design services for a new 21.5-mile-long, single circuit, 230kV transmission line. The line was attached to existing 500kVand 115kV structures, where the line runs parallel. New lattice towers and steel poles were also installed on existing rights-of-way between two substations.