230kV Transmission Line and Foundation Design Overview
North Carolina, Virginia
When it was determined that a new line was needed to continue to provide reliable electric service to certain areas, GAI provided transmission line and foundation design services for a new 21.5-mile-long, single-circuit, 230kV transmission line. The line was attached to existing 500kV and 115kV structures, where the line runs parallel. New lattice towers and steel poles on drilled shaft foundations were also installed on existing rights-of-way between two substations.