GAI designed a section of river-crossing transmission line to relocate it above flood stage. Foundations were designed to accommodate up to 12’ of erosion from extreme weather conditions and excessive flooding. By procuring steel poles from a local firm and altering designs extensively to accommodate local materials, GAI helped the client avoid high out-of-country taxes and time lost importing materials.